(1)
All digitally prepared plans, sections and print copies thereof kept at the mine shall be suitably indexed.
(2)
Every plan, section or part thereof prepared under these rules shall carry thereon a certificate for its correctness and shall be signed by the mining engineer with date:
Provided that the geological plans and sections shall be certified and signed by the geologist employed under rule 55.
(3)
Every copy of a plan and section or part thereof submitted or maintained under these rules shall bear a reference to the original plan or section from which it was copied and shall be certified thereon by the holder of the mining lease to be a true copy of the original plan or section.